A 17,340 SF regional truck facility with five bays, a two-lane fuel island, CNG sensing, a truck wash, tire carousel, and truck lifts, delivered on a pre-engineered metal building with split-face masonry.

Project facts

Dallas, Texas

17,340SF

Total facility

5

Service bays

20KGAL

Diesel capacity

2,863SF

Office

Location
Dallas, Texas
Facility type
Regional truck rental and service facility
Total building
17,340 SF
Office
2,863 SF
Service bays
5
Fueling
Two-lane fuel island: 20K gal diesel, 4K gal gasoline, 2K gal DEF
Structure
Pre-engineered metal building with split-face masonry

Note:Contract value, schedule, delivery method, and outcome details for this project are being confirmed with the project team and client before publication. The facts above are the facility program as built.

Office with desks and windows looking onto the truck yard

The project

Requirement, build, result

What the facility had to do
Rent, fuel, wash, and service trucks from one compact site. The 17,340 SF building holds five service bays, truck lifts, and a tire carousel, plus rental and service lobbies, locker rooms, a driver’s lounge, and breakrooms in 2,863 SF of office.
What that means for the build
Fueling and fluid systems drive the sequence on a facility like this. A two-lane fuel island with 20,000 gallons of diesel, 4,000 gallons of gasoline, and 2,000 gallons of DEF, CNG sensing in the shop, and a truck wash each carry their own permitting, testing, and commissioning path. They have to be coordinated with the pre-engineered metal building and the split-face masonry so nothing is waiting on anything else.
The result
A regional facility that combines customer-facing space, driver amenities, and specialized operating systems in one building. The project has been publicly described as LEED certified; the certification level and record are being confirmed before AP states it as a project fact.

Photography

Penske Dallas, as built

  • Rental and service lobby with waiting area and Penske-branded counter
    Rental and service lobby
  • Service shop interior with five bays, lifts, and overhead reels
    Five service bays with truck lifts

Facility features

  • Two-lane fuel island with diesel, gasoline, and DEF
  • CNG sensing in the service area
  • Truck wash, tire carousel, and truck lifts
  • Shade canopies over the yard
  • Rental and service lobbies, locker rooms, driver’s lounge, and breakrooms

What this project shows

For owners planning truck & fleet facilities, this project is evidence of the questions AP asks before the slab is poured: how the site circulates, what the structure and paving have to carry, which systems drive the permitting and commissioning sequence, and what the facility needs on the day it opens.

Every AP project runs on the same system: preconstruction that settles cost, scope, and schedule; a Project Manager, Superintendent, and Project Coordinator accountable through turnover; and a master schedule with three-week look-aheads that keeps the field, the design team, and the owner on one plan.

Planning a similar facility?

Tell us the program, the site, and the opening date. We will walk you through what this project taught us and what to settle first.

Get an instant estimate