Commercial Construction Cost per Square Foot in Texas, by Building Type
What commercial buildings cost per square foot in Texas, from AP’s cost index: office, retail, bank, industrial and more, with size, metro, and soil factors.
Owner-focused guidance, published monthly
Practical guidance from AP’s preconstruction and operations team on the decisions that decide cost, schedule, and how a facility performs.
AP publishes for the people who have to make a facility decision: developers, owners, logistics and fleet operators, and corporate real-estate teams. Topics follow the questions we hear in preconstruction, grouped as Market Conditions, Preconstruction, Industrial Planning, Truck & Fleet Facilities, Permitting & Development, Safety, Case Studies, and Company News.
AP publishes new owner-focused insights monthly. Every article names the AP team responsible for it and carries a review status, so readers always know how far along a piece is.

Latest
What commercial buildings cost per square foot in Texas, from AP’s cost index: office, retail, bank, industrial and more, with size, metro, and soil factors.
How a build-to-suit warehouse differs from leasing a spec building, what each includes, and what a tenant should write into the work letter before signing.
How many service bays an auto service center needs, how to size the service drive and parking, and where room for growth belongs on the site.
What a bank or credit union teller line renovation involves: pods or a line, cash handling, security, cabling, and phasing the work while members keep banking.
What a new warehouse costs per square foot in Texas, from AP’s own cost index: base rates, size, market, soil and coastal factors, and worked examples.
Developing an industrial site along the Ship Channel and Galveston Bay: county review, drainage, windstorm rules, pipeline easements, and soils.
The site work that decides a distribution center: due diligence, platting, grading, utilities, detention, truck court paving, and how to size trailer parking.
How to choose between a pre-engineered metal building and a conventional structural steel frame for a shop, plant, or flex building in Texas.
Which materials and equipment run long on Texas industrial projects, why lead times moved, and how to build release dates into the schedule.
How to plan a truck service or fleet facility: bay count and depth, circulation, fuel and DEF, wash systems, heavy-duty paving, driver space, and commissioning.
Nine decisions an owner can settle before preconstruction begins, and why each one changes the budget, the schedule, and the quality of the first estimate.
Send us the site, the program, or the drawings you have. A preconstruction review tells you what you are building, what it should cost, and where the risks are.