Four questions, about a minute
A planning-level cost range in about a minute
Enter the ZIP, the building type, and the size. We return a range you can plan around, built on AP’s own cost index, then follow up with a real number.
Instant estimate
Four questions, one range
The range comes from AP’s own cost index: a base rate for the building type, adjusted for the market, the size, the distance from the metro core, site conditions, and soils. Building cost only, and a starting point a preconstruction review turns into a real number.
What comes next
From a range to a real number
01
Range
The wizard gives you an order-of-magnitude range, its factors, and what it excludes, on screen and by email.
02
Conversation
A preconstruction lead calls to learn the site, the operation, and the opening date.
03
Preconstruction review
Site and document review, staged estimating, and a constructability and risk log.
04
Commit
A leveled, trade-by-trade estimate with procurement and permitting mapped into the schedule.
Estimate questions
How accurate is the instant estimate?
It is an order-of-magnitude planning range built from AP’s own cost index: a base rate by building type, adjusted for market, size, distance from the metro, conditions, and soils. It tells you whether a project is in the right neighborhood. A preconstruction review replaces it with a real number.
What does the range include and exclude?
It is building construction cost only, including general conditions, overhead, and fee. It excludes land, site work beyond the pad, offsite utilities, permit and impact fees, design fees, entitlement, FF&E, owner equipment, testing, escalation, contingency, and financing. The full list appears with every result.
Why does the range change with location and size?
Labor, materials, and trade coverage differ by market, so each market carries a percentage against Dallas-Fort Worth, plus a travel adder past 45 miles from the metro core. Small buildings cost more per square foot because mobilization, restrooms, and the fire riser do not shrink with the footprint.
What happens after I send the range?
You receive the range with its assumptions by email, and a member of AP’s preconstruction team follows up to learn more about the site and the operation. If it makes sense, the next step is a preconstruction review with a staged estimate.
Can I get a range for a renovation or a rollout?
The wizard is tuned for ground-up work in Texas, Louisiana, and Oklahoma. Renovations, occupied-branch phasing, and multi-site programs depend on the existing building and the program, so send a message or call and we will scope it directly.
Go deeper
